FAT/SAT Support & Commissioning is a critical phase of any industrial project that ensures equipment, systems, and processes are fully tested and ready before commercial operation begins. It includes Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), technical support during testing, and final commissioning to verify that every system performs according to design specifications and operational requirements.
Factory Acceptance Testing (FAT) is conducted prior to the delivery of the equipment at the manufacturer's site and Site Acceptance Testing (SAT) is conducted after installation to verify that the system performs as desired in actual operation. Once these stages are completed, commissioning confirms that the plant is safe, reliable, and ready for production.
We at TDV Engineering Solutions offer expert FAT/SAT Support & Commissioning in India that will assist our client in minimizing the risk associated with commissioning, solve technical issues in the initial stages of the project and enable them to get their plant up and running without any hassles or delays.
It is important to make sure that equipment is manufactured and assembled to approved specifications prior to its shipment to the project site. We have a Factory Acceptance Testing Service to help you find problems early on, thus minimizing delays and expensive modifications during installation.
Testing machines and equipment to confirm they perform according to approved technical specifications.
Verifying automation systems, instrumentation, alarms, interlocks, and control functions before dispatch.
Inspecting fabrication quality, mechanical assembly, electrical installations, and overall equipment readiness.
Reviewing inspection reports, certificates, manuals, and engineering documents before equipment is approved for shipment.
Our Factory Acceptance Testing Service in India helps ensure equipment reaches the project site ready for installation and commissioning.
After installation, Site Acceptance Testing verifies that equipment operates correctly under actual site conditions. It confirms successful installation, proper integration with existing systems, and readiness for commissioning.
Our Site Acceptance Testing Service includes:
Checking that equipment is installed according to approved drawings, specifications, and manufacturer recommendations.
Verifying communication between equipment, control systems, instrumentation, and utilities.
Testing system functionality and performance under real operating conditions.
Confirming the system meets the required production capacity, safety standards, and operational requirements.
Our Site Acceptance Testing Service in India ensures a smooth transition from installation to commissioning while reducing operational risks.
Successful project execution requires more than completing FAT and SAT. Our FAT/SAT Support Service provides technical assistance throughout the testing process, helping clients address observations and prepare systems for commissioning.
Coordinating FAT and SAT activities with clients, OEMs, contractors, and project teams.
Reviewing equipment performance, engineering documents, and test results to ensure compliance.
Supporting timely corrective actions for observations identified during testing.
Preparing and reviewing inspection reports, checklists, and final acceptance documentation.
Our FAT SAT Support Service in India helps minimise project risks, improve testing efficiency, and ensure successful project handover.
Commissioning is the final verification process before an industrial facility begins commercial operation. It ensures that mechanical, electrical, instrumentation, and automation systems function safely and efficiently as an integrated plant.
Supporting safe start-up of equipment and process systems.
Testing complete systems to verify operational performance.
Confirming production capacity, efficiency, and process reliability.
Ensuring all project requirements and safety checks are completed before handover.
Our Commissioning Service in India helps clients achieve reliable plant performance while reducing start-up risks.
A successful Plant Commissioning Service ensures that every process, utility, and production system works together efficiently before commercial production begins.
Our Plant Commissioning Service in India helps improve plant reliability, minimise downtime, and ensure facilities are ready for safe and efficient operation.
Our industry expertise enables us to deliver reliable testing, validation, and commissioning solutions tailored to each project's operational requirements.
Backed by 50+ engineers, our team provides dependable engineering support for industrial projects, ensuring smooth testing, commissioning, and project execution.
From Factory Acceptance Testing to final Plant Commissioning, we support every stage of project delivery.
Our engineers work closely with clients, OEMs, contractors, and project teams to ensure every system performs as intended.
As an ISO 9001:2015 and ISO 27001 certified organization, we follow structured engineering practices to deliver accurate and reliable results.
Founded by experienced technocrats with Fortune 500 project exposure, we understand the challenges of industrial testing, commissioning, and plant start-up.
Our systematic approach helps minimise delays, reduce risks, and support efficient project handover.
Professional FAT/SAT Support & Commissioning Services ensure equipment is safely and efficiently tested, validated, and ready to use. Our team of experts at TDV Engineering Solutions can help clients from beginning to end, from Factory Acceptance Testing to Plant Commissioning, ensuring a seamless project execution and a reliable start-up of the plant. Call us and speak with us about your project needs.
Don’t hesitate to contact us for more information about company or service